找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 2926|回复: 1

塑料模具专业术语中英文对照

[复制链接]

12

主题

23

回帖

738

积分

村里打铁的

UID
517
威望
0
机械币
146
活力
-10
发表于 2015-12-11 17:58:33 | 显示全部楼层 |阅读模式
塑料模具专业术语中英文对照

模具术语
一、入水:gate
进入位: gate location
水口形式:gate type
大水口:edge gate
细水口: pin-point gate
水口大小:gate size
转水口: switching runner/gate
唧嘴口径: sprue diameter
二、流道: runner
热流道: hot runner,hot manifold
热嘴冷流道: hot sprue/cold runner
唧嘴直流: direct sprue gate
圆形流道:round(full/half runner
流道电脑分析:mold flow analysis
流道平衡:runner balance
热嘴: hot sprue
热流道板:hot manifold
发热管:cartridge heater
探针: thermocouples
插头: connector plug
插座: connector socket
密封/封料: seal
三、运水:water line
喉塞:line lpug
喉管:tube
塑胶管:plastic tube
快速接头:jiffy quick connector plug/socker
四、模具零件: mold components
三板模:3-plate mold
二板模:2-plate mold
边钉/导边:leader pin/guide pin
边司/导套:bushing/guide bushing
中托司:shoulder guide bushing
中托边L:guide pin
顶针板:ejector retainner plate
托板: support plate
螺丝: screw
管钉:dowel pin
开模槽:ply bar scot
内模管位:core/cavity inter-lock
顶针: ejector pin
司筒:ejector sleeve
司筒针:ejector pin
推板:stripper plate
缩呵:movable core,return core core puller
扣机(尼龙拉勾):nylon latch lock
斜顶:lifter
模胚(架): mold base
上内模:cavity insert
下内模:core insert
行位(滑块): slide
镶件:insert
压座/斜鸡:wedge
耐磨板/油板:wedge wear plate
压条:plate
撑头: support pillar
唧嘴: sprue bushing
挡板:stop plate
定位圈:locating ring
锁扣:latch
扣鸡:parting lock set
推杆:push bar
栓打螺丝:S.H.S.B
顶板:eracuretun
活动臂:lever arm
分流锥:spure sperader
水口司:bush
垃圾钉:stop pin
隔片:buffle
弹弓柱:spring rod
弹弓:die spring
中托司:ejector guide bush
中托边:ejector guide pin
镶针:pin
销子:dowel pin
波子弹弓:ball catch
喉塞: pipe plug
锁模块:lock plate
斜顶:angle from pin
斜顶杆:angle ejector rod
尼龙拉勾:parting locks
活动臂:lever arm
复位键、提前回杆:early return bar
气阀:valves
斜导边:angle pin
术语:terms
承压平面平衡:parting surface support balance
模排气:parting line venting
回针碰料位:return pin and cavity interference
模总高超出啤机规格:mold base shut hight
顶针碰运水:water line interferes withejector pin
料位出上/下模:part from cavith (core)side
模胚原身出料位:cavity direct cut on A-plate,core direct cut on B-plate.
不准用镶件: Do not use (core/cavity) insert
用铍铜做镶件: use beryllium copper insert
初步(正式)模图设计:preliinary (final) mold design
反呵:reverse core
弹弓压缩量:spring compressed length
稳定性好:good stability,stable
强度不够:insufficient rigidity
均匀冷却:even cooling
扣模:sticking
热膨胀:thero expansion
公差:tolorance
铜公(电极):copper electrode

43

主题

779

回帖

5688

积分

机械厂主管

UID
49282
威望
0
机械币
814
活力
1207

活跃会员

发表于 2024-10-3 08:04:20 | 显示全部楼层
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

手机版|小黑屋|机械村 ( 渝ICP备17010994号-1|渝公网安备50022702001048号 )

GMT+8, 2024-11-21 16:44 , Processed in 0.019841 second(s), 6 queries , Gzip On, Redis On.

Powered by 机械村

Copyright © 2012- Jixiecun.com

快速回复 返回顶部 返回列表